Task Order Number Field added to column chooser in Task Grid within TimeTrak Professional
August 18, 2023 Product Tips,
From version 22.2.4, the Task Order Number field (Order No) is now available for selection within the task grid via column chooser and can be dragged into the Task Grid as per below:
Allowing the Task Order Number to be easily seen within the grid
This is also available in the task grid against jobs:
And clients as per below:
This functionality provides the ability for staff to easily identify the correct task when speaking to clients as well as the ability to search tasks for the client/ job based on the order number as per below:
At a global level, tasks can be searched via the task order number from the main task grid by right clicking on the Task ID field and selecting Order No
Which will change the Task Id field to a task order number search field where users can enter the clients order number and hit enter or select the search icon
This will then open the first task with the searched order number against the task as per below:
Search
Categories
Tags
Latest Entries
TimeTrak 24.1 Release Notes – What’s New
May 2, 2024
TimeTrak SMS
May 1, 2024
Job Quote Line Narrations Displayed in TimeTrak APP
June 22, 2023
TimeTrak – Jobs
June 13, 2023
TimeTrak – Tasks
May 23, 2023
Video: What’s new in TimeTrak 24.1
May 9, 2024
TimeTrak Newsletter – May 2024
May 7, 2024
Assign multiple serviceable units to a Job, Task or Appointment via TimeTrak APP
May 7, 2024
Payroll OverTime Calculator
May 2, 2024